본문으로 건너뛰기

2000atelier Standard Operating Procedures

SOPs for design, pattern making, and production operations at 2000atelier, Kyndof's custom costume and garment creation division.

Overview

2000atelier transforms creative visions into wearable art through meticulous craftsmanship and systematic processes. These SOPs ensure every piece meets our quality standards while maintaining efficient production workflows.

Categories

Design

Creative development from concept through client approval.

SOP IDTitleStatus
SOP-001Design Brief IntakeActive
SOP-002Concept PresentationActive
SOP-003Design Revision ProcessActive

Pattern

Technical pattern development, grading, and fitting.

SOP IDTitleStatus
SOP-010Measurement CollectionActive
SOP-011Pattern CreationActive
SOP-012Pattern GradingActive

Production

Fabrication, assembly, finishing, and quality assurance.

SOP IDTitleStatus
SOP-020Cutting StandardsActive
SOP-021Sewing Quality StandardsActive
SOP-022Finishing ChecklistActive
SOP-023Quality InspectionActive

Key Process Flows

Client Project Workflow

  1. Intake: SOP-001 - Design Brief Intake
  2. Concept: SOP-002 - Concept Presentation
  3. Pattern: SOP-011 - Pattern Creation
  4. Cutting: SOP-020 - Cutting Standards
  5. Sewing: SOP-021 - Sewing Quality
  6. Finishing: SOP-022 - Finishing Checklist
  7. QA: SOP-023 - Quality Inspection

Revision Workflow

  1. Request: SOP-003 - Design Revision
  2. Pattern Adjustment: SOP-011 - Pattern Creation (modification)
  3. Re-Production: Return to cutting/sewing/finishing as needed

Department Contacts

  • Creative Director: Design direction, complex project approval
  • Production Manager: Production workflow, resource allocation, quality oversight
  • Pattern Team Lead: Technical pattern questions, grading decisions

Quality Standards

All 2000atelier SOPs enforce these core quality principles:

  • Grain Accuracy: ≤1/8 inch tolerance on all pattern pieces
  • Seam Quality: Straight stitching, secure backstitching, clean finishing
  • Fabric Waste: ≤15% average across projects
  • Timeline Adherence: 90%+ on-time delivery rate
  • Client Satisfaction: ≥4.5/5.0 average rating

Department Owner: Creative Director SOP Count: 12 procedures Last Updated: 2026-02-02