Order to Delivery Process

Complete customer fulfillment workflow from initial inquiry through final delivery.

Process Overview

This end-to-end process spans two departments (Brand Ops → 2000atelier) and typically takes 4-8 weeks depending on project complexity.

Process Flow Diagram

BRAND OPS (SALES)          2000ATELIER (DESIGN)         2000ATELIER (PATTERN)       2000ATELIER (PRODUCTION)
───────────────── ──────────────────── ───────────────────── ────────────────────────

[Client Inquiry]

[SOP-100: Qualify]

[SOP-101: Quote]

[SOP-102: Contract]

HANDOFF ────────────→ [SOP-001: Design Brief]

[SOP-002: Concepts]

[Client Approval]

HANDOFF ──────────────→ [SOP-011: Pattern Create]

[SOP-012: Grading]

HANDOFF ──────────────→ [SOP-020: Cutting]

[SOP-021: Sewing]

[SOP-022: Finishing]

[SOP-023: QA Inspection]

[Client Delivery]

Involved SOPs

Phase 1: Sales (Brand Ops)

StepSOPOwnerTypical Duration
Inquiry ResponseSOP-100Sales Rep0-4 hours
Quote PreparationSOP-101Sales Rep2-3 business days
Order ConfirmationSOP-102Sales Rep1-2 business days

Milestone: Contract signed + deposit received


Phase 2: Design (2000atelier)

StepSOPOwnerTypical Duration
Design Brief IntakeSOP-001Design Coordinator3-5 business days
Concept DevelopmentSOP-002Lead Designer5-7 business days
Concept PresentationSOP-002Lead Designer1 business day
Revisions (if needed)SOP-003Lead Designer2-3 business days per round

Milestone: Design approved by client


Phase 3: Pattern (2000atelier)

StepSOPOwnerTypical Duration
Measurement CollectionSOP-010Pattern Maker1-2 business days
Pattern CreationSOP-011Pattern Maker3-5 business days
Pattern GradingSOP-012Pattern Maker1-2 business days (if needed)

Milestone: Pattern approved and ready for cutting


Phase 4: Production (2000atelier)

StepSOPOwnerTypical Duration
Fabric CuttingSOP-020Cutter0.5-1 day
Sewing & AssemblySOP-021Sewing Team2-5 business days
FinishingSOP-022Finisher1-2 business days
Quality InspectionSOP-023QA Inspector0.5 day

Milestone: Final piece approved and ready for delivery


Total Cycle Time

ComplexityTypical DurationNotes
Simple (single costume, straightforward design)4-5 weeksMinimal revisions, standard materials
Moderate (multiple pieces, some complexity)6-7 weeks1 round of revisions, specialty fabrics
Complex (intricate design, large production)8-12 weeksMultiple fittings, experimental techniques

Critical Handoff Points

Handoff 1: Sales → Design

Trigger: Contract signed + deposit received

Required Information:

  • Signed contract
  • Approved quote with scope details
  • Client contact information
  • Payment confirmation

Owner: Sales Rep hands off to Design Coordinator

Common Issues:

  • Incomplete client information (delays intake)
  • Unrealistic timeline expectations set by Sales
  • Budget vs. scope mismatch

Mitigation: Sales uses SOP-100 qualification process thoroughly


Handoff 2: Design → Pattern

Trigger: Client approves design concepts

Required Information:

  • Approved design sketches
  • Material specifications
  • Size/measurement requirements
  • Construction notes

Owner: Designer hands off to Pattern Team Lead

Common Issues:

  • Ambiguous construction details (pattern interpretation errors)
  • Missing measurements or size information
  • Material availability not confirmed

Mitigation: Design brief (SOP-001) includes complete technical specifications


Handoff 3: Pattern → Production

Trigger: Pattern completed and approved

Required Information:

  • Complete pattern pieces with markings
  • Fabric requirements and sourcing
  • Construction sequence notes
  • Special technique instructions

Owner: Pattern Maker hands off to Production Manager

Common Issues:

  • Fabric not ordered in advance (production delays)
  • Pattern pieces missing notches or markings
  • Special techniques not documented

Mitigation: Production Manager reviews pattern and fabric status before accepting handoff


Common Delays & Mitigation

Delay CauseTypical ImpactMitigation Strategy
Client slow to approve designs+3-7 daysSet approval deadline in contract; follow-up sequence
Fabric out of stock+5-10 daysVerify material availability BEFORE quote send
Pattern fit issues requiring revision+3-5 daysSchedule fitting session for complex projects
Rush orders displacing current workVariableCharge rush fee (+50%); communicate delays to affected clients
Scope creep (client adds requirements)+2-7 daysUse change order process; client approves timeline/budget impact

Quality Gates

GateCriteriaResponsibleConsequence of Failure
Contract ApprovalSigned contract + deposit receivedSales ManagerProject does not start
Design ApprovalClient written approval of sketchesCreative DirectorPattern work cannot begin
Pattern ApprovalTechnical review passedPattern Team LeadCutting cannot begin
Cutting QualityGrain alignment, no flaws, complete piecesProduction ManagerRe-cut required (timeline delay)
Sewing QualitySeam quality, construction accuracySewing Team LeadRework required (timeline delay)
Final QAZero defects, all specs metQA InspectorCannot deliver; rework or remake

Process Metrics

MetricTargetCurrentMeasurement Method
On-Time Delivery Rate≥90%Baseline period - data collection initiated Q1 2026Projects delivered by promised date / total projects
Cycle Time (Simple Projects)≤30 daysTracking started Q1 2026Contract date → delivery date
Revision Rate≤30%Historical analysis in progressProjects requiring design revisions / total projects
QA Pass Rate (First Inspection)≥95%QA tracking system implemented Q1 2026Projects passing QA on first inspection / total projects
Client Satisfaction (Post-Delivery)≥4.5/5.0Survey distribution begins Q1 2026Average rating from post-delivery survey

Continuous Improvement

Monthly Review:

  • Production Manager and Sales Manager review metrics
  • Identify top 3 delays from past month
  • Implement mitigation strategies
  • Update relevant SOPs if process changes

Quarterly Optimization:

  • Full process walkthrough with all stakeholders
  • Identify handoff friction points
  • Streamline communication channels
  • Update cycle time targets based on actual performance

Process Owner: COO Last Updated: 2026-02-02 Next Review: 2026-05-02